103259
Conservative Operations
2018-05-15T13:20Z
A Conservative Operations event has been issued from 09:19 on 05.15.2018 through 10:19 on 05.15.2018 due to weather
false
true
Alert
2018-05-15T13:19Z
2018-05-15T14:19Z
2018-05-15T13:19Z
AEP
Control Area
103257
Minimum Generation Emergency Declaration
2018-05-15T12:12Z
A Minimum Generation Emergency Declaration has been issued. PJM anticipates the need for 28 % reducible generation effective 08:10 on 05.15.2018 through 11:10 on 05.15.2018 . PJM encourages members to investigate selling energy out of the Control Area during this time frame. Please contact the PJM Shift Supervisor to adjust the variable ramp if the ramp limit is restricting your ability to sell out of the Control Area.
false
false
Warning
2018-05-15T12:10Z
2018-05-15T12:10Z
AECO
Transmission Zone
103252
Emergency Load Mgmt Reduction Action
2018-05-14T16:16Z
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Long_120 . Product(s) dispatched: Capacity Performance DR,Extended Summer DR,Limited DR,Annual DR
true
true
Action
2018-05-14T15:15Z
2018-05-14T13:15Z
Limited DR
Long_120
2018-05-14T15:15Z
Extended Summer DR
Long_120
2018-05-14T15:15Z
FE-AP
Control Area
Extended Summer DR
Long_120
2018-05-14T15:15Z
Annual DR
Long_120
2018-05-14T15:15Z
COMED
Control Area
Capacity Performance DR
Long_120
2018-05-14T15:15Z
Extended Summer DR
Long_120
2018-05-14T15:15Z
AEP
Control Area
Extended Summer DR
Long_120
2018-05-14T15:15Z
Annual DR
Long_120
2018-05-14T15:15Z
DOM
Control Area
Annual DR
Long_120
2018-05-14T15:15Z
Limited DR
Long_120
2018-05-14T15:15Z
PPL
Transmission Zone
103247
Emergency Load Mgmt Reduction Action
2018-05-11T12:08Z
An Emergency Load Mgmt Reduction Action and a NERC level EEA2 have been issued. Load reduction start times can be found by clicking on the hyperlink(s) in the Regions column. Load reductions should continue until released by PJM. Reductions are mandatory based on product requirements. CSPs should review DR Hub for specific registration details. Lead Time(s) dispatched: Quick_30 . Product(s) dispatched: Limited DR
Additional Comments: PARtial RegL
true
true
Action
2018-05-03T14:39Z
2018-05-03T11:20Z
Extended Summer DR
Quick_30
2018-05-03T14:15Z
BGE
Transmission Zone
AEP
103259
2018-05-15T13:19Z
FE-AP
103252
2018-05-14T13:15Z
COMED
103252
2018-05-14T13:15Z
AEP
103252
2018-05-14T13:15Z
DOM
103252
2018-05-14T13:15Z
PPL
103252
2018-05-14T13:15Z
BGE
103247
2018-05-03T11:20Z