2018 RTEP Proposal Window 1
Window closed on 8.31.2018
Project ID
|
Proposing
Entity
|
Target
Zones(s) |
Analysis Type |
FG# |
Major Component/Project Description |
1A |
DEOK
|
DEOK |
Summer N-1 Load Drop |
N1-SLD1 |
Add redundant relaying to Port Union 138kV Bus 2 to eliminate the contingency driving the reliability criteria violation. |
2A |
Dominion |
Dominion |
Summer N-1 High Voltage |
N1-SVH1, N1-SVH2 |
This is an operational solution that will remotely open Davis TX#1 breaker L122, immediately following the breaker-failure event (2036T2142) at Radnor Substation thus resolving the post contingency high voltage. |
2B |
Dominion |
Dominion |
Summer N-1 High Voltage |
N1-SVH1, N1-SVH2 |
Move the existing 230/69kV TX#4 to the vacant 230/69kV TX#2 spot at Davis Substation. |
2C |
Dominion |
Dominion |
Summer N-1 High Voltage |
N1-SVH1, N1-SVH2 |
Move spare 230/69kV transformer from Jefferson Street Substation to the vacant Transformer #2 bay at Davis Substation. |
2D |
Dominion |
Dominion |
Summer N-1 High Voltage |
N1-SVH1, N1-SVH2 |
Construct a 230kV four (4) breaker GIS ring bus in Davis Substation and terminate existing Line 2037 and Line 2121. |
2E |
Dominion |
Dominion |
Summer N-1 High Voltage |
N1-SVH1, N1-SVH2 |
Install a 50 MVAR fixed shunt reactor at Davis Substation on the 69kV bus. |
2F |
Dominion |
Dominion |
Summer N-1 High Voltage |
N1-SVH1, N1-SVH2 |
A new substation called Cloverleaf with a 230kV variable shunt reactor with a new 230kV underground line roughly 300 ft extending from Cloverleaf Substation to Davis substation terminating at the 230kV bus. |