2018/19 Long-Term RTEP Proposal Window 1

Window closed on 3.2.2019

Proposal ID
Target
Zone(s) 
 Analysis Type Congestion Driver   Major Component/Project Description
469 MetEd
Market Efficiency
ME-1 Install a SmartWires Device on the Lincoln - Hunterstown 115 kV line
293 MetEd
Market Efficiency
ME-1
Build a 4 position 115 kV ring bus (Meade) at Lincoln Tap Substation
398 MISO
Market Efficiency
ME-7
Build new 345 kV transmission line from the existing Meadow Lake station to a new 345 kV switching station called “Pike Creek".
249 MISO
Market Efficiency
ME-7
Install a 50 MW 4-hour battery at the existing Trail Creek 138 kV station.
129 MISO
Market Efficiency
ME-7
Build a new 138 kV Kuchar station on the Bosserman-Liquid Carbonics 138 kV line. Extend a new 138 kV single circuit transmission line from the Kuchar Station to the existing Luchtman Station.
436 MISO
Market Efficiency
ME-7
Build a new Toto 345 kV Switching Station and interconnect the existing Olive - Reynolds #1, Olive - Reynolds #2, and Schahfer - Burr Oak 345 kV transmission lines
481 MISO
Market Efficiency
ME-7
Reconductor Michigan City-Trail Creek-Bosserman (6.7 mile and 4.0 mile) and Maple – LNG 138 kV (7.8 mile) circuits.
322  AMIL  Market Efficiency ME-6 Build a new 345 kV line between the Palmyra and Herleman Substations and rebuild the existing Palmyra – Marblehead 161 kV line and a Marblehead – Herleman 138 kV line. 
506  AMIL Market Efficiency ME-6 Build a new 345 kV line between the Maywood and Herleman Substations and rebuild the existing Palmyra – Marblehead 161 kV line and a Marblehead – Herleman 138 kV line.  
775   MISO Market Efficiency ME-2 Decouple part of multi-bundled conductor on a portion of Monroe-Wayne 345 kV line and re-utilize the adjacent Monroe-Coventry line. 
078   MISO Market Efficiency ME-2 Decouple part of multi-bundled conductor on a portion of Monroe-Wayne 345 kV line. 
782   MISO Market Efficiency ME-2 Upgrade the Monroe-Wayne 1&2 345 kV line rating by replacing switches at the 345 kV Wayne Station. 
830 MetEd Market Efficiency ME-1 Build a 500/115 kV substation on Hunterstown-Conastone 500 kV line near Littlestown, PA. and build a 115 kV line from new station to Germantown station. 
616  MetEd Market Efficiency ME-1 Build a 500/230 kV substation on Hunterstown-Conastone 500 kV line near Wentz, MD., build a 230 kV line from new substation to Carroll substation, install a 500/230 kV transformer Peach Bottom station, and build a Peach Bottom-Graceton 230 kV line. 
593 MetEd  Market Efficiency ME-1 Build a 500/115 kV substation on Hunterstown-Conastone 500 kV line near Littlestown, PA., build a 115 kV line from new substation to Germantown substation, install a 500/230 kV transformer at Peach Bottom, and build a Peach Bottom-Graceton 230 kV line. 
387 MetEd  Market Efficiency ME-1 Build a 500-230 kV substation on Hunterstown-Conastone 500 kV line near Wentz, MD. and build a 230 kV line from new substation to Carroll substation. 
413 MetEd  Market Efficiency ME-1 Build a 115 kV line from Hunterstown to Lincoln stations and install a 10 MW 2-hour battery at Lincoln. 
402 MetEd  Market Efficiency ME-1 Build a 115 kV line from Hunterstown to Lincoln stations and install a 25 MW 2-hour battery at Lincoln.
960 MetEd  Market Efficiency ME-1 Build a 115 kV line from Hunterstown to Lincoln substations.
868 MetEd  Market Efficiency ME-1 Build a 500 kV switchyard on the PEBO-DELT 500 kV line and install a new 115 kV ring bus at the Orrtanna tap point of the METED Hunterstown – Orrtanna – Lincoln 115 kV line.
453 MetEd  Market Efficiency ME-1  Install a 25 MW 4-hour battery at Lincoln 115 kV station.
201 MetEd  Market Efficiency ME-1  Install a 25 MW 2-hour battery at Lincoln 115 kV station.
892 MetEd  Market Efficiency ME-1  Install a 50 MW 2-hour battery at Lincoln 115 kV station.
647 MetEd  Market Efficiency ME-1 Install a 115 kV ring bus at the Orrtanna tap point of the METED Hunterstown – Orrtanna – Lincoln 115 kV line, build an Otter Creek 500/230 kV station, and rebuild 1.3 miles of Manor – Graceton 230 kV line.
511 MetEd  Market Efficiency  ME-1  Install a 115 kV ring bus at the Orrtanna tap point of the METED Hunterstown – Orrtanna – Lincoln 115 kV line and build an Otter Creek 500/230 kV substation.
007 MetEd Market Efficiency ME-1 Install a 115 kV ring bus at the Orrtanna tap point of the METED Hunterstown – Orrtanna – Lincoln 115 kV line.
034 MetEd  Market Efficiency ME-1 Rebuild the Hunterstown – Lincoln - Germantown 115 kV and Germantown - Carrol 138 kV lines as double circuit 230 kV line.
622 MetEd Market Efficiency ME-1 Rebuild the Hunterstown - Lincoln 115 kV line.
021 MetEd Market Efficiency ME-1 Rebuild the Hunterstown-Lincoln 115 kV line, build a Peach Bottom - Graceton 230 kV circuit, upgrade the existing Face Rock 115/69 kV transformers and circuit switching at Rice and Ringgold 230 kV stations.
389 MetEd Market Efficiency  ME-1 Rebuild the Hunterstown-Lincoln 115 kV line, add a Peach Bottom 500/230 kV transformer, and add a Peach Bottom-Graceton 230 kV line.
357 MetEd Market Efficiency ME-1 Build a 500/230 kV substation on the Delta - Peach Bottom 500 kV line, build a 230 kV line from the new station to Graceton, build a 230 kV switching station on the Carroll - Mt. Airy 230 kV line, and build a 230 kV line from the new station to Hunterstown.
847 MetEd Market Efficiency  ME-1 Build a 500/230 kV substation on the Delta - Peach Bottom 500 kV line, build a 230 kV line from the new station to Graceton and reconductor the Hunterstown - Lincoln 115 kV line.